| タイトル | Heuristic-based scheduling algorithm for high level synthesis |
| 本文(外部サイト) | http://hdl.handle.net/2060/19940017231 |
| 著者(英) | Tan, Han-Ngee; Chng, Chew-Lye; Mohamed, Gulam |
| 著者所属(英) | Nanyang Technological Inst. |
| 発行日 | 1992-01-01 |
| 言語 | eng |
| 内容記述 | A new scheduling algorithm is proposed which uses a combination of a resource utilization chart, a heuristic algorithm to estimate the minimum number of hardware units based on operator mobilities, and a list-scheduling technique to achieve fast and near optimal schedules. The schedule time of this algorithm is almost independent of the length of mobilities of operators as can be seen from the benchmark example (fifth order digital elliptical wave filter) presented when the cycle time was increased from 17 to 18 and then to 21 cycles. It is implemented in C on a SUN3/60 workstation. |
| NASA分類 | COMPUTER PROGRAMMING AND SOFTWARE |
| レポートNO | 94N21704 |
| 権利 | No Copyright |
| URI | https://repository.exst.jaxa.jp/dspace/handle/a-is/114896 |