タイトル | A model for the cost of doing a cost estimate |
本文(外部サイト) | http://hdl.handle.net/2060/19930010247 |
著者(英) | Buchanan, H. R.; Remer, D. S. |
著者所属(英) | Jet Propulsion Lab., California Inst. of Tech. |
発行日 | 1992-08-15 |
言語 | eng |
内容記述 | A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K((C(sub p))(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns. |
NASA分類 | ECONOMICS AND COST ANALYSIS |
レポートNO | 93N19436 |
権利 | No Copyright |
|