タイトル | Flight evaluation of two segment approaches for jet transport noise abatement |
本文(外部サイト) | http://hdl.handle.net/2060/19740008882 |
著者(英) | Rogers, R. A.; Gale, C. M.; Wohl, B. |
著者所属(英) | American Airlines, Inc. |
発行日 | 1973-06-01 |
言語 | eng |
内容記述 | A 75 flight-hour operational evaluation was conducted with a representative four-engine fan-jet transport in a representative airport environment. The flight instrument systems were modified to automatically provide pilots with smooth and continuous pitch steering command information during two-segment approaches. Considering adverse weather, minimum ceiling and flight crew experience criteria, a transition initiation altitude of approximately 800 feet AFL would have broadest acceptance for initiating two-segment approach procedures in scheduled service. The profile defined by the system gave an upper glidepath of approximately 6 1/2 degrees. This was 1/2 degree greater than inserted into the area navigation system. The glidepath error is apparently due to an erroneous along-track, distance-to-altitude profile. |
NASA分類 | FACILITIES, RESEARCH, AND SUPPORT |
レポートNO | 74N16995 NASA-CR-114735 |
権利 | No Copyright |
URI | https://repository.exst.jaxa.jp/dspace/handle/a-is/195863 |
|