タイトル | A New Spin |
本文(外部サイト) | http://hdl.handle.net/2060/20040084505 |
著者(英) | Casani, John |
著者所属(英) | Jet Propulsion Lab., California Inst. of Tech. |
発行日 | 2004-06-01 |
言語 | eng |
内容記述 | The trouble was that the shuttle was still under development when that schedule was set. As time went on, the Shuttle had problems with its high pressure turbines, thermal protection tiles, engines, and more. The early launch dates had to be scrapped. NASA Headquarters told us, "We re going to delay your launch two years to allow more time for the Shuttle development to take place. You can slow your development accordingly." Right off the bat, we looked into the celestial mechanics and how they would affect us. The difficulty in launching a spacecraft to Jupiter changes on a year-to- year basis, in a cyclical pattern that repeats about every ten or twelve years. In order to achieve the velocity needed to get from low earth orbit to Jupiter, an upper stage is required in the Shuttle. For the 1982 launch the upper stage was adequate, but it could not provide the velocity we would need in 1984. This meant we would have to separate the Galileo probe from the Galileo orbiter before launch and put each of them on separate Shuttles with separate upper stages. When we told the folks at Headquarters this, they told us, "Okay we'll give you two Shuttle launches." |
NASA分類 | Spacecraft Design, Testing and Performance |
権利 | No Copyright |
URI | https://repository.exst.jaxa.jp/dspace/handle/a-is/221771 |
|