タイトル | One Methodology for Proving Compliance to the Commercial Crew Program (CCP) Abort Capability Requirement |
本文(外部サイト) | http://hdl.handle.net/2060/20120016725 |
著者(英) | Proud, Ryan; Adam, Jason |
著者所属(英) | NASA Johnson Space Center |
発行日 | 2011-11-18 |
言語 | eng |
内容記述 | As of Draft 4.0 of the CCT-REQ-1130 requirements document for CCP, ISS Crew Transportation and Services Requirements Document, specific language for the verification of the abort capability requirement, 3.3.1.4, was added. The abort capability requirement ensures that the CTS under dispersed conditions is always capable of aborting from a failed LV. The Integrated Aborts IPT was asked to author a memo for how this verification might be completed. The following memo dictates one way that this requirement and its verification could be met, but this is the not the only method. |
NASA分類 | Launch Vehicles and Launch Operations |
レポートNO | FltDyn-CCP-11-1 JSC-CN-27150 |