タイトル | Current status and some future test directions for the U.S. National Transonic Facility |
著者(英) | Gloss, Blair B. |
著者所属(英) | NASA Langley Research Center |
発行日 | 1992-01-01 1992 |
言語 | eng |
内容記述 | The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of the tunnel systems were performed over the following two years. In August 1984, the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamics calibration and testing to commence. Since 1984 several operational problems have been identified and successfully solved which is demonstrated by the fact that the facility has operated the last year with no significant facility down times. Also during this time period, development of test techniques and instrumentation has continued. This paper will review some of the recent test techniques and instrumentation developments, and will briefly review the status of the facility. |
NASA分類 | RESEARCH AND SUPPORT FACILITIES (AIR) |
レポートNO | 94A10404 |
権利 | Copyright |
URI | https://repository.exst.jaxa.jp/dspace/handle/a-is/312121 |
|