タイトル | The Giotto Extended Mission (GEM) - High risk, high payoff |
著者(英) | Nye, H. R.; Morani, A. |
著者所属(英) | NASA Headquarters; Jet Propulsion Lab., California Inst. of Tech. |
発行日 | 1993-02-01 |
言語 | eng |
内容記述 | In February 1990, ESA began reactivation of the Giotto spacecraft, which had been dormant for the previous four years, via the omnidirectional low-gain antenna mounted atop the Giotto. By the end of April 1990, spacecraft temperatures had been reduced to levels at which the experiments could be activated; of the original complement of ten experiment modules, the magnetometer, energetic particle analyzer, and optical probe experiment were fully functional, and an additional three instruments were partly damaged but usable. A mission that targetted Comet Grigg-Skjellerup 214 million km from the earth was then put into effect. |
NASA分類 | ASTRONAUTICS (GENERAL) |
レポートNO | 93A34591 |
権利 | Copyright |
|