タイトル | Beam instrumentation for commissioning PEP-2 with BaBar |
その他のタイトル | BaBarを設置したPEP-2の試運転のためのビーム検出装置 |
著者(日) | Fisher, Alan S.; Anderson, S.; Cai, Yunhai; Clendenin, J.; Decker, F. J.; Donald, M. H.; Ecklund, S.; Erickson, R.; Fieguth, T.; Himel, T. |
著者(英) | Fisher, Alan S.; Anderson, S.; Cai, Yunhai; Clendenin, J.; Decker, F. J.; Donald, M. H.; Ecklund, S.; Erickson, R.; Fieguth, T.; Himel, T. |
著者所属(日) | Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center |
著者所属(英) | Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center; Stanford Linear Accelerator Center |
発行日 | 2000-02 |
刊行物名 | Proceedings of International Workshop on Performance Improvement of Electron-Positron Collider Particle Factories: e(+)e(-) Factories 1999 Proceedings of International Workshop on Performance Improvement of Electron-Positron Collider Particle Factories: e(+)e(-) Factories 1999 |
開始ページ | 124 |
終了ページ | 130 |
刊行年月日 | 2000-02 |
言語 | eng |
抄録 | Tue PEP-2 B Factory had its first collisions in July 1998, and began its first run with the BaBar detector in May 1999. Luminosity has increased steadily through the run, exceeding 1 x 10(exp 33) by mid-September (1/3 of design), by gradually increasing the currents in the two rings, by improving the compensation for the effect of BaBar's 1.5-T solenoid on the beam optics, and by refining feedbacks for orbit drift and IP position. This paper will review PEP's instrumentation, especially aspects that have been important during this commissioning period. |
キーワード | PEP-2; BARBAR detector; beam instrument; commissioning; beam current; electron storage ring; systems engineering; PEP-2; BARBAR検出器; ビーム検出装置; 試運転; ビーム電流; 電子蓄積リング; システムエンジニアリング |
資料種別 | Conference Paper |
SHI-NO | AA0032165022 |
レポートNO | KEK-Proceedings-99-24 |
URI | https://repository.exst.jaxa.jp/dspace/handle/a-is/49789 |