JAXA Repository / AIREX 未来へ続く、宙(そら)への英知

このアイテムに関連するファイルはありません。

タイトルHigh power tests of the prototype 352 MHz beta 0.85 five cell cavity for the TRASCO project
その他のタイトルTRASCOプロジェクトのためのプロトタイプ352MHz、ベータ0.85、5セル空洞の高パワー試験
著者(日)Chiaveri, E.; Losito, R.; Calatroni, S.; Ballantini, R.; Chincarini, A.; Gemme, G.; Parodi, R.; Barni, D.; Bosotti, A.; Pagani, C.
著者(英)Chiaveri, E.; Losito, R.; Calatroni, S.; Ballantini, R.; Chincarini, A.; Gemme, G.; Parodi, R.; Barni, D.; Bosotti, A.; Pagani, C.
著者所属(日)European Organization for Nuclear Res.; European Organization for Nuclear Res.; European Organization for Nuclear Res.; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare
著者所属(英)European Organization for Nuclear Research; European Organization for Nuclear Research; European Organization for Nuclear Research; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare; Istituto Nazionale di Fisica Nucleare
発行日2003-06
刊行物名Proceedings of the 10th Workshop on RF Superconductivity, SRF2001
Proceedings of the 10th Workshop on RF Superconductivity, SRF2001
開始ページ360
終了ページ362
刊行年月日2003-06
言語eng
抄録The Five-cell beta 0.85 cavities built at CERN for the development of the TRASCO Project is fully tested at the CERN SL-CT Test Bench. The cavity, built using the standard Niobium on Copper technique, was previously tested in a vertical cryostat, showing Q(sub 0) and field exceeding the design goal for the TRASCO Project (2.5 x 10(exp 9) and 5.5 MV/m at 4.5 K). After the successful test it was decided to check the performances of the cavity installed in a horizontal cryostat and equipped with a LEP-2 type high power main coupler and HOM couplers. The cavity was equipped with the helium tank, tuners and couplers at CERN and tested at the SL-CT facility at CERN under a collaboration agreement between INFN and CERN. The behavior of the fully equipped cavity substantially confirmed the results of the preliminary production tests in the vertical cryostat. The quality factor at low field was substantially unchanged. No MP activity was detected confirming the soundness of the design and the quality of the surface treatment.
キーワードTRASCO Project; prototype; superconducting cavity resonator; Nb/Cu cavity; high power test; vertical cryostat; HOM coupler; LEP2; Nb film coating; research and development; surface resistance; magnetron sputtering; TRASCOプロジェクト; プロトタイプ; 超伝導空洞共振器; Nb/Cu空洞; 高パワー試験; 垂直クライオスタット; HOMカプラー; LEP2; ニオブ薄膜コーティング; 研究開発; 表面抵抗; マグネトロン・スパッタリング
資料種別Conference Paper
SHI-NOAA0046174063
レポートNOKEK-Proceedings-2003-2
URIhttps://repository.exst.jaxa.jp/dspace/handle/a-is/52201


このリポジトリに保管されているアイテムは、他に指定されている場合を除き、著作権により保護されています。