JAXA Repository / AIREX 未来へ続く、宙(そら)への英知

このアイテムに関連するファイルはありません。

タイトルCassini Titan Science Integration: Getting a 'Jumpstart' on the Process
著者(英)Steadman, Kimberly B.; Burton, Marcia E.; Pitesky, Jo E.; Alonge, Nora K.; Ray, Trina L.
著者所属(英)Jet Propulsion Lab., California Inst. of Tech.
発行日2010-04-25
言語eng
内容記述The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.
NASA分類Lunar and Planetary Science and Exploration
権利Copyright


このリポジトリに保管されているアイテムは、他に指定されている場合を除き、著作権により保護されています。