| タイトル | Interim Land Use Control Implementation Plan |
| 本文(外部サイト) | http://hdl.handle.net/2060/20150023597 |
| 著者(英) | Applegate, Joseph L. |
| 著者所属(英) | NASA Kennedy Space Center |
| 発行日 | 2014-11-30 |
| 言語 | eng |
| 内容記述 | This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification. |
| NASA分類 | Environment Pollution |
| レポートNO | KSC-E-DAA-TN20537 LUCIP-SWMU 055 |
| 権利 | Copyright, Distribution under U.S. Government purpose rights |