タイトル | Project analysis and integration area |
本文(外部サイト) | http://hdl.handle.net/2060/19830002254 |
著者(英) | Aster, R. W.; Fox, G. |
著者所属(英) | Jet Propulsion Lab., California Inst. of Tech. |
発行日 | 1982-04-01 |
言語 | eng |
内容記述 | A simulation program that investigates the relationship between manpower requirements and equipment availability in the presence of scheduled and unscheduled maintenance is presented. A method for optimization of metallization patterns is presented. |
NASA分類 | ENERGY PRODUCTION AND CONVERSION |
レポートNO | 83N10524 |
権利 | No Copyright |